check

You are here

Information on the progress of the implementation of SGO 2005-2015

Information on the progress of the implementation of SGO 2005-2015

as of 1 October 2016

№ pointsSGO

Name of event

Form

complete

Responsible

performers

Time

performance

The measures taken and the results achieved

SGO 2008 (presidential Decree of 14.02.2008 No. 535)

1.

66

The introduction of new models of pharmaceutical insurance and state standards in pharmacy

Information to the Administration

President of Kazakhstan

MHSD, PEACE, mayors of Astana and Almaty, areas

every year

January

2009-2010

In the implementation of a new model of provision of medicines of the instruction removed from control of the administration of the President of the Republic of Kazakhstan in accordance with resolution of the Head of presidential Administration A. Musin on January 28, 2010 No. 61-26.65.

In implementing state standards in the pharmacy order with resolution Head AP of 13.12.2014, No. 4584-8 transferred to the control of the Government.

 With the purpose of this assignment the Ministry of health and social development of the RK adopted measures to improve legislation in the sphere of circulation of medicines, which provide for mandatory implementation in 2018 standards appropriate pharmaceutical practices (GMP, GCP, GDP, GPP, and GVP). Established national pharmaceutical Inspectorate.

In the Republic today:

GMP standards are 11 pharmaceutical manufacturers (21 production sites);

GDP – 44 2257 distributors of pharmaceutical warehouses

GPP – 23 pharmacies

ISO – 14 production of medical devices

Plan of action:

Revitalization of the work on the development of a quality system for pharmaceutical Inspectorate and the continuation of the events of the accession of the pharmaceutical Inspectorate in the international system of cooperation pharmaceutical inspection (PIC/S).

 

2.

9

Construction of 350 outpatient clinics, flasher-midwife stations and health centers by 2015

information in the President's Administration

MH, MF, MNE, governors of the regions,

Astana and Almaty

December

2011 – 2015

Long-term control is performed, there is a risk of non-fulfillment

The project "Construction of 100 schools and 100 hospitals" of the 99 health facilities completed construction of 99 objects in total amount of 287,2 billion. The project in fully implemented.

Reference: Resolution of the Head of the presidential Administration of the Republic of Kazakhstan Musin A. E. from 29.04.2009, No. 1845-10 implementation period of this order was extended until 2011.

Resolution of the Head of the presidential Administration of the Republic of Kazakhstan Musin A. E. from 10.09.2012, № 157-6 PUB the period of implementation of the order № 310 was extended until the end of 2016.

The last report was sent to the Government by letter dated 20.01.2016 year № 07-1-14/67,4//20-45/001-368,01-31P.1.9 and in the administration of the President RK from 30.12.2015 year № 07-1-14/01-474.

The project "Construction of 350 VA, FAP and clinics" of the 350 health care facilities completed the construction of 342 facilities (including in 2016, 32 in 2015, and 56 in 2014, -134, 2013 – 96, in 2012 – 23, 2011: 1) (or 97.7% of the total plan) the construction of 8 objects.

However, the government of Akmola, Atyrau and East Kazakhstan regions in 2015, admitted the failure of the timing input 6 facilities in operation, including:

- 3 clinics, 2 polyclinics for 250 visits per shift in Akkol, Akkol district and in the village of Zerenda,  Zerenda district of Akmola region in connection with absence of financing from the local budget, and 1 polyclinic for 100 visits per shift in p. Geologist Atyrau  region in connection with backlog from the schedule;

- 3 VA, 2 VA International in the village of Esil district of Akmola region and in the village of Znamenka of Semey of EKR in connection with judicial proceedings and 1 BA in the village Kabanbai Batyr Tselinograd district of Akmola region in connection behind of schedule due to force major due to a fire at the storage warehouse in which was the distraction of all medical equipment.

Of them to the current date put into operation outpatient clinic for 250 visits per shift in Akkol, Akkol district of Akmola region, a polyclinic for 100 visits per shift in p. Geologist Atyrau region.

Plan of action: Revitalization of the work with building owners (construction management govenments of oblasts and cities of Astana and Almaty) in terms of completion of the 8 health facilities until the end of 2016 under the plan (in Akmola region – 4, in East Kazakhstan – 1, Karaganda – 2, Kyzylorda region – 1).

However, if litigation there is a risk of not completing this year the construction of 2 International VA in the village of Yessil district of Akmola region (the initial deadline 2014) and in the village of Znamenka of Semey of EKR (initial completion in 2015).

Reference: Akimat of Akmola region, construction of ISLANDS in the S. International, due to litigation with the contractor LLP "Grif-HB", in time is not completed (under the plan of operation in 2014). According to the administration, currently performed to select a new contractor to complete the remaining work and 19.08.2016 year agreement was signed with LLP "Enbek".

Similarly, the region for the construction of VA in the village of Znamenka, the Families, in connection with litigation with the contractor LLP "Ferromex", there is a risk of a failure of the input object. According to the administration, the measures for determining the remaining amount of construction work to tender and identify contractors.

Also, it should be noted that the construction of VA in the village Kabanbai Batyr Tselinograd district and polyclinic in the village of Zerenda Zerenda district of Akmola region marked by the fact that the delayed delivery of medical equipment.

In this case, the delay in the supply of medical equipment at the VA in village Kabanbai Batyr Tselinograd district is connected with force majeure circumstances (a fire in the storage warehouse was vandalized medical equipment) clinic in the village of Zerenda ,Zerenda district contractor equipment in full on backorder. For the improper performance of the contract according to the objects to file a claim in court.

The completion date of the project determined in 2016 (resolution of the Head of the presidential Administration of the Republic of Kazakhstan Musin A. E. from 10.09.2012, № 157-6 PUB the period of implementation of the order № 1158 extended until the end of 2016).

The completion date of the project determined in 2016 (resolution of the Head of the presidential Administration of the Republic of Kazakhstan Musin A. E. from 10.09.2012, № 157-6 PUB the period of implementation of the order № 1158 extended until the end of 2016).

SGO 2015 (decree of the President RK from 25.12.2015 No. 143)

3.

34

Mainstreaming the concept of social development of the Republic of Kazakhstan up to 2030 in terms of social welfare and development of human capital

Resolution Of The Government Of The Republic Of Kazakhstan

MHSD, MON, MNE, MOF

May

2016

Executed

The corresponding decree approved by the Prime Minister of the Republic of Kazakhstan may 31, 2016 No. 321.

The purpose of the Concept is creation of conditions for improving the quality and competitiveness of human capital and achieving a high standard of quality of life for all Kazakhstan citizens.

The Concept of changes and additions in the following areas:

in the field of health and education in accordance with new State programs and the implementation of the action Plan of the nation;

housing and engineering reflected the construction of rental housing with the planned introduction of housing into operation in the years 2015-2019;

in terms of social security provided by the new approaches in implementing the policy of pension security, targeted social assistance in the new format, employment.

On the resolution of the head of the AP of Kazakhstan Nigmatulin N. as of June 9, 2016 No. 3416-2 PUB, the item is removed from the control.

4.

35

 

Actualization of the employment Road map – 2020 in terms of clarifying:

the main directions, taking into account

status in the labor market, including measures to increase mobility of labor resources;

additional expenses

for infrastructure projects on repair of social and engineering-transport facilities and utilities by analogy with the roadmap 2009 – 2010

resolution of the government of the Republic of Kazakhstan

MH, MF, MA, NEM, WORLD, me, MES, governors of cities Astana and Almaty, regions,

NCE "Atameken" (In coordination)

March 2016

Executed

The corresponding decree approved by the Prime Minister of the Republic of Kazakhstan of 22 December 2015 No. 1029.

The updated Program includes new initiatives to strengthen employment and preservation of jobs in the new economic conditions, taking into account the experience of implementation of active employment programmes of the leading world countries in times of economic crisis.

To encourage the preservation of jobs provided by the mechanisms of subsidizing of losses of the income of skilled workers at reduced working time, the provision of grants to employers for training workers, and government support for professional training of young workers aged 18 to 24 years under condition of preservation of workplaces

Through the creation of new jobs, new initiatives include the intensification of labor mobility internal labor migrants, repatriates and young people in the regions identified by the Government as well as improving the efficiency of micro-credit organization of small-scale industries in the experience of South Kazakhstan region.

In order to increase employment in the services sector envisages the organization of special target programmes (short courses) for the training of workers in the service sector, including maintenance of the international exhibition EXPO – 2017, and retraining individuals who have lost their jobs at the age of 55 - 64 years.

In accordance with the instructions of the President for the implementation of the updated Program, there are about 63 billion tenge, including to create new jobs with infrastructure projects will have 26 billion tenge by analogy with the Road map in 2009 and 2010.

The implementation of new initiatives will contribute to the stability of the labor market and to prevent significant growth of unemployment and create the necessary conditions for sustainable post-crisis development. On the resolution of the head of the AP of Kazakhstan Nigmatulin N. on March 10, 2016 No. 3356 PUB, the item is removed from the control.

5.

36

Development of proposals on optimization of the social security system

proposals to the presidential Administration of the Republic of Kazakhstan

MH, MNE, MOF, MES, MIR, governors of Astana and Almaty, areas

March 2016

Long-term control, turns

The proposals in the President's Administration sent a letter dated March 24, 2016 No. 13-2-18/36297//143 in paragraph 36.

On the resolution of the head of the AP of Kazakhstan Nigmatulin N. April 7, 2016 No. 3365-1 PUB, the item is transferred to long-term control communication of the presidential Administration at the end of 2017 and 2018 (January 10).

6.

37

Extension experience in the implementation of targeted social assistance based on mutual obligations for families, which includes working members

The information in the administration of the President of the Republic of Kazakhstan

The MHSD RK, governors of Astana and Almaty, areas

December 2016

Marks

2014 in a pilot mode, a project "Orleu" on introduction of conditional cash transfers in three regions (Akmola, East Kazakhstan and Zhambyl oblasts).

From 1 July 2015 identified 38 districts and cities where implemented regional projects for the payment of social assistance on the basis of the social contract at the expense of the local budget by analogy with the project "Orleu".

In order to fully prepare and create unified approaches to implementation of the Law RK "On amendments and additions to some legislative acts of the Republic of Kazakhstan on issues of social protection of the population" from 2016, gradually introduces a new model of social assistance system for the provision of conditional cash transfers in pilot mode in all cities and districts of the Republic.

For the implementation of the pilot project from the national budget for 2016 is allocated the target current transfers in the amount of 1.4 billion tenge.

According to M&E on October 1, 2016 conditional cash assistance under the project "Orleu" assigned to 30.1 thousand persons in total amount of 899,8 million tenge. In active forms of employment assistance was by 6 844человек or 90% of the total working-age participants of the project Orleu, including:

- Become parties to the ERM-2020 – 1 625 people (23,7 %);

- employed on permanent jobs – 3 480 people (50.9 per cent);

- directed community work and social jobs – 1 675 people (24.5 per cent);

- sent for retraining (professional development), and other – 64 people (0.9 per cent).

7.

38

Develop proposals for:

the revision of the composition of the food basket and minimum standards of food consumption for different age groups;

change the methodology for determining the subsistence minimum

proposals to the presidential Administration of the Republic of Kazakhstan

MH, MNE, MF, Government of Astana and Almaty, areas

December 2016

Marks

The Ministry of health and social development of the RK (hereinafter-the Ministry) is continuing work on improving the subsistence minimum, in terms of reviewing the composition of the food basket.

Thus, in the second half of 2015, the Ministry jointly with the Kazakh Academy of nutrition was started the study on the revision of the energy value and composition of the food basket, the results of which, together with the interested state bodies will develop proposals to change the method of calculating the subsistence minimum.

Currently, the Kazakh Academy of nutrition carries out the revision of the interim report submitted to the research work "Improvement of evaluation and development of a new version of the food part of subsistence minimum with the specification value of basal metabolism and daily energy expenditures of children and women".

 

Changed on 8 November, 2016 - 18:07
Achievements over the years of independence of RK
Targeted social assistance
Combating the worst forms of child labor
Information campaign «Safe work»
Best social projects implemented in Kazakhstan
The Republican contest «Enbekzholy»
Skills and jobs
NQS